See which stops cost the most.
Stops by line, machine and cause from machine signals, with root cause analysis that weighs process data, asset history and similar past stops.
Stops ranked by costMachines and lines from different vendors and PLC generations, in one live view per plant and one view across plants. See where stops and energy cost you most, and act first where it pays.
Built from the PLCs, SCADA and historians each plant already runs. We read the PLC directly or use OPC UA, map each plant once with your team, starting from your own tag names and descriptions, and the next plant reuses it. Nothing is installed on the PLCs.
Run state, stops, counts and speeds per line, from machine signals, with good and reject counts where the PLC records them.
Compressed air, steam, chillers and power, next to the lines they serve.
Work orders and spare parts from your CMMS export, on the asset they belong to.
Meters, day-ahead prices and weather, so energy per unit and timing are visible.
Each plant keeps its own tag names, codes and units. VeldtGraph maps them once, so “which machines are running” or “parts per hour across plants” works without knowing a single tag name.
The same state, reported three ways, becomes one comparable reading.
| Plant tag | Raw value | Mapping | Common value |
|---|---|---|---|
| L3_STATE | 3 | code 3 = running | Running |
| Filler.RunBit | TRUE | run bit | Running |
| Mode | AUTO | AUTO + speed > 0 | Running |
| Output_PPM | 5.2 | × 60 | 312 parts/h |
Operations, maintenance, security, energy and emissions on the machine itself, and the same record for every similar machine at every plant.
Example: the Line 3 filler at Plant 2, as one asset record.
| View | What you see |
|---|---|
| Operations | Running, 312 parts/h, 2 short stops this shift |
| Maintenance | Drive motor vibration rising, spare motor in stock |
| Security | No unexpected connections to its controller |
| Energy & emissions | 0.06 kWh and 0.03 kg CO₂e per part, from the Line 3 power meter |
| Price | €84/MWh day-ahead, cheaper hours tonight |
| Value at risk | ≈ €18k over 30 days |
Illustrative values.
Every recommendation shows the data behind it and its value in euros. Your team approves every action.
Stops by line, machine and cause from machine signals, with root cause analysis that weighs process data, asset history and similar past stops.
Stops ranked by costHealth scores and failure models per failure mode (bearings, seals, electrical, thermal) show remaining useful life and the cost-optimal time to replace.
Replace on time, not too early or too lateProcess values watched with SPC control limits and against the same process in other plants.
Drift flagged with the data behind itMeters joined to output, so the plants and lines that use the most energy per unit stand out.
Energy waste ranked by costPlan compressors, chillers and other flexible loads around day-ahead prices, within production limits.
Load plans weighed against priceA fix that worked in one plant is checked against every similar machine in the others before you roll it out.
One benchmark across every plantPassive monitoring of your plant networks, with every alert joined to the machine and line it can affect.
Operations and security see the same alert, on the same machine.
A passive sensor on a mirror port or TAP per plant network, with no software on PLCs. Data leaves the plant outbound only, encrypted. Designed to support operators’ IEC 62443 and NIS2 programs.
Gas, power and steam meters become energy per unit and Scope 1 and 2 emissions, traced to the tag that produced them. Useful for energy audits, ISO 50001 and Scope 1 and 2 reporting.
Example: a curing oven’s gas meter, from the source tag to the reported figure.
| Step | What happens |
|---|---|
| Source tag | FT-210 oven gas flow, read from the PLC |
| Activity data | Volume, unit and timestamp aligned by the platform |
| Per unit | Gas per part, joined to Line 2 output |
| Result | CO₂e by machine, line, plant and period |
Illustrative values.
VeldtGraph reads what your machines already report and adds the business context you choose to share.
Siemens S7, EtherNet/IP, Modbus TCP and OPC UA. Nothing installed on the PLCs. S7 PLCs are read over S7 communication on the plant Ethernet, so no PROFINET device is added.
From an export you already have, agreed with you, so output and stops show which product and order they belong to.
Outbound-only connections, wherever it runs.
Then roll the same definitions out across your plants.
A focused first engagement, measured against your own baseline.
First results in 2 to 4 weeks. You decide on rollout after you see them.